Britain is replacing the 1885 law that protects its seabed cables, but the proposed rules cover only internet cables. The power cables that bring offshore wind ashore and link Britain to its neighbours are being left out, even though they share the same seabed and face the same threats.

  Author: Indeximate & Nick Loxton, Loxtopus Intelligence

In the same year that Britain last introduced legislation that looked to govern the protection of seabed cables, it also attended the Berlin Conference, where the continent of Africa was infamously partitioned between imperial powers. The Submarine Telegraph Act of 1885 currently still governs the protection of Britain’s seabed cables and is woefully outdated. It is due to be updated, but unless power cables are included alongside their telecommunications family, only half of Britain’s subsea infrastructure will be legislated. This potentially is a national security risk.

In May 2026 the Government announced that it would replace the Telegraph Act, aiming to bring the legislation from the age of telegraph to the age of Artificial Intelligence. In place of the Submarine Telegraph Act of 1885, ministers propose tougher penalties for vessels that damage them, new duties on operators to prevent, detect and respond to interference, and emergency powers to direct businesses during a crisis. A white paper is promised and, given recent Russian activity around British waters, the case for it is not seriously contested.

However, the proposals apply to subsea internet cables. They do not apply to the high-voltage cables that bring offshore wind ashore or carry electricity between Britain and its neighbours. These sit within a different department, under a different regulator and, concerningly, with no equivalent obligations in prospect.

Those two sets of cables share the same seabed corridors and are threatened by the same vessels and attack methodologies. An attack on either would cause significant impact to the UK economy and its national security. However, only one of them is being given rules.

 

Half a policy

The thinking behind the May announcement has a clear lineage. The Joint Committee on the National Security Strategy (JCNSS) opened an inquiry into undersea cables in February 2025 and reported in September, finding that British deterrence was ‘too timid’ and that government resilience planning paid too little attention to whether the system could absorb a shock. It called for the 1885 legislation to be modernised, for monitoring and response to be integrated, and for a sovereign repair ship by 2030.

The Government replied in December 2025. It agreed to update its worst-case planning scenarios for coordinated sabotage, to ask landing station operators for emergency repair plans, and to develop commercial relationships supporting cable monitoring with the Royal Navy’s maritime domain awareness team. It also established an Undersea Infrastructure Security Oversight Board, chaired by the Cabinet Office. This is highly encouraging. However, critically, power cables are conspicuous by their absence.

The framing throughout is telecommunications. The committee’s report is titled ‘Subsea telecommunications cables’. The Government’s response of December 2025 answers sixteen recommendations without using the words power, electricity or interconnector once. The May 2026 announcement refers to subsea internet cables from its headline onwards.

What makes that absence conspicuous is that power – energy, and its security – is such a topical issue presently. The Government’s response names the Department for Energy Security and Net Zero (DESNZ) twice: once in committing the Ministry of Defence to work with it in evaluating commercial cable repair capacity, and once in listing it among the departments coordinating any expansion of underwater monitoring.

The same document discusses malign activity against ‘submarine cables and pipelines’ in its answer on interdicting suspicious vessels (recommendation 10), and the governance body it announces is the Undersea Infrastructure Security Oversight Board rather than a subsea cables board (recommendation 15). Both framings reach well beyond fibre.

Power is therefore consulted without being regulated. DESNZ has a seat in the rooms where cable security is coordinated, while the cables it is responsible for are given no new duties.

The reason is administrative rather than deliberate. Telecommunications cable policy belonged to the Department for Science, Innovation and Technology (DSIT), which was dissolved when the machinery of government was reorganised in July 2026, and the telecoms brief moved into an expanded culture and media department. Offshore wind export cables and interconnectors have remained throughout with DESNZ, licensed by the Office of Gas and Electricity Markets (Ofgem).

The reorganisation has, if anything, widened the distance. One family of cables now sits in a department built around digital and media policy, whilst the other sits in a department built around energy supply (it is perhaps fair to assume that the staff of those differing departments will have vastly differing experiences, priorities and enthusiasm for subsea infrastructure).

The European Subsea Cables Association put the division to the committee directly, noting that DSIT held telecommunications cable policy while DESNZ oversaw power, and asked for a review of emergency repair measures for subsea power cables.

 

The repair gap

The clearest illustration of what the division could mean came on Christmas Day in 2024, when a tanker named the Eagle S left the Russian port of Ust-Luga and, according to the account Finnish prosecutors later gave the Helsinki District Court, dragged its anchor along the floor of the Gulf of Finland for some ninety kilometres. It cut five cables, four of which carried data. The fifth, Estlink 2, carried 650 megawatts of electricity between Finland and Estonia.

The data cables were repaired within a fortnight, with both of Elisa’s cables and the C-Lion1 link back in service by 6th January 2025. Estlink 2 did not return to commercial operation until 20th June 2025, almost six months after the anchor passed over it. The same anchor on the same stretch of seabed took fifteen times as long to recover from in one case as in the other. Britain’s adversaries will have noted this – it is important that our legislators do too.

That difference is structural. Telecommunications repair is organised around standing agreements, principally the Atlantic Cable Maintenance Agreement, under which dedicated vessels must sail within 24 hours of a fault and a cable ship typically reaches a British fault within eight days. Power cable repair has no equivalent.

The European Subsea Cables Association and the International Marine Contractors Association warned in August 2025 that power cables are larger, more complex and harder to repair than telecommunications cables, that Europe lacks a coherent maintenance framework for them, and that the vessels capable of the work are usually tied up on installation projects. This is a critical vulnerability, one which legislation must help to tackle.

The association’s own guidance puts a typical power cable repair at three to nine months where the operator is relying on a vessel of opportunity. The Offshore Renewable Energy Catapult’s failure database records average downtime of 62 days for export cables and 38 days for inter-array cables.

British experience sits inside that range. The IFA2 interconnector to France was out from November 2023 to February 2024, NorNed for roughly three months in 2022, and BritNed for about two months over the winter of 2020. Island links fare worse: Scottish and Southern Electricity Networks notes that an island cable failure can take many months to locate and repair.

A fair summary is that a telecommunications fault in British waters is a matter of weeks and a serious power cable fault is a matter of months until resolution.

The honest caveat is that the maintenance agreement does admit power cable members. Ørsted joined in 2019 as its first renewable energy member, placing some 900 kilometres of inter-array cable from its British wind farms under a repair framework with Global Marine Group. That cover is for array cables rather than for the export cables whose loss takes a whole project off the grid. However, this is one organisation’s decision to do this.

The general position stands: power operators have no standing power-capable repair fleet of the kind telecommunications has had for decades, and no obligation to build one. This must change.

Whether a British export cable comes back in two months or six depends on arrangements its owner made years earlier: whether it holds a repair contract with guaranteed access to a vessel, whether spare cable of the right type has already been manufactured and stored, and whether jointing teams are on call. Leaving that to commercial discretion exposes critical national infrastructure, and with it the security of electricity supply, to critical but avoidable risk.

Repair capacity for cables the state treats as critical belongs in the licence rather than in the market: a specified standard of access to vessels, spares and jointing skills, set by DESNZ and Ofgem and tested, in the way the sovereign repair ship question has already been put for telecommunications.

 

What a lost cable costs

A long outage is a different order of problem from a short one, and the costs compound in three directions at once.

The first is revenue. An export cable is the only route to market for everything behind it. A severed cable completely halts a wind farm’s output, whilst a gigawatt-scale project idling for six months loses a season of generation. The cost falls on the operator, its lenders and ultimately onto consumers – thus central government should be incentivised to protect against such energy shocks purely from a cost of living perspective.

Insurers have seen this clearly for years. According to GCube Insurance, subsea cables accounted for roughly 30 per cent of offshore wind claims and more than half of all claims spend over the decade to 2020; the Offshore Renewable Energy Catapult reports that individual cable claims frequently exceed £10 million.

The second is the system. Britain now has ten electricity interconnectors, the high-voltage cables laid under the sea to France, Belgium, the Netherlands, Norway, Denmark and Ireland, through which the country imports and exports electricity. They are working parts of the supply rather than spare capacity held in reserve. They balance the grid when domestic generation is short, they are part of how the country manages winter peaks, and they are increasingly part of how a system with high renewable penetration stays stable.

Finland spent a winter without Estlink 2. A British outage would be unlikely to fall at a random moment (if part of a deliberate hostile actor’s action). An adversary choosing when to act would pick a cold, windless week, when wind generation is low, demand is high and imported power is carrying the most load. That is also the week in which a repair measured in months would have the greatest adverse impact.

The third is concentration. Offshore wind is not spread evenly around the coast. Export cables converge on a small number of landfall points and share seabed corridors with each other, with interconnectors and with telecommunications cables. National Grid has acknowledged multiple known exposures on cables including the interconnector to France and North Sea Link, and in 2026 went to market for protection work on them. A vessel that drags an anchor across one of those corridors, whether through incompetence or intent, is unlikely to hit only one asset.

Those three, allied together, show the asymmetry to be a security issue above all else. Cutting a telecommunications cable is disruptive and visible, and in a well-connected country the traffic reroutes. Cutting a power cable removes capacity that cannot be rerouted, for a period measured in months rather than days and weeks, and presently there is no fleet standing by to shorten it. An adversary assessing which British seabed asset offers the greatest effect for the least risk is doing the same arithmetic and reaching the same answer.

 

Britain’s security of its own seabed

The division between the two cable families is a feature of government reorganisation and stovepiped regulation per department, but it is not how the state thinks about defending the seabed.

The Defence Investment Plan published on 30 June 2026 committed £330 million over four years to protecting critical underwater infrastructure, including enhanced capability for RFA Proteus, alongside £1.5 billion for the Atlantic Bastion programme. The language throughout is cables and pipelines, undifferentiated between the two families.

In April 2026 the Defence Secretary disclosed a month-long operation tracking Russian submarines over British seabed infrastructure, and the Ministry of Defence stated that Russian vessels threatening British waters had increased by 30 per cent over two years. The responsible ministerial departments for the two families of cables did not feature in the announcement, which came exclusively from the Ministry of Defence.

The Government’s own response to the committee points the same way. It committed the Ministry of Defence to work with DESNZ and the telecommunications department to evaluate commercial cable repair capacity, and it raised the possibility of new legislation on monitoring capabilities. Both workstreams reach power by their own logic.

The European Union has already drawn the conclusion. Its Action Plan on Cable Security, published in February 2025, covers communication and electricity cable infrastructure in a single framework across prevention, detection, response and repair. It proposes national sensor networks, names distributed acoustic sensing as a detection method, and describes the role of private operators in building the picture as paramount.

British operators selling into European markets, financed by European lenders and insured in a European market, will not be insulated from that framework by the way responsibility happens to be divided in Whitehall. Every British interconnector has an operator at the other end who falls inside it, so its requirements are likely to reach the cable even where they do not reach the British licence.

 

What next for power cables?

Our reading is that the obligations now being drafted for telecommunications operators will reach power cables.

The most likely shape is a duty to know what is happening around the cable. The May 2026 proposals require telecommunications operators to prevent, detect and respond to security compromises. Prevention and response are familiar ground for an offshore transmission owner. Detection, however, is not.

An operator can say today how its cable is performing electrically; rather fewer can say whether a vessel is loitering above it, whether an anchor is being dragged across it, or whether the seabed around it has shifted, and almost none can say so as it happens. This is a capability gap which needs to be filled.

Three things should follow, and none of them requires waiting for the white paper.

    1. The operator duties being drafted for telecommunications should be extended to power cables designated as critical national infrastructure in the same instrument, not a later one. Writing them for one cable family and aiming to return to the other later is how the present gap was created. There is much on this current government’s legislative agenda – it must seek to tackle both families in the same piece of legislation now or risk the second half joining the back of the queue, leaving an incoherent policy framework around our subsea infrastructure in the interim.
    2. The Cabinet Office board should publish a single monitoring expectation covering both families, so that operators learn what detection is held to mean before it arrives as a licence condition. At present an operator willing to invest has no standard to invest against.
    3. DESNZ and Ofgem should treat continuous monitoring, like repair capacity, as part of what a transmission licence requires rather than as a matter for each owner’s commercial judgement. A cable the state counts as critical should not be one whose owner is free to decide how much of it is watched.

The obvious objection is that none of this is required of power operators yet. That is true, but it will not endure: insurers already treat cables as their largest single exposure in offshore wind. Lenders are financing assets whose entire physical route to market is one buried cable. The European framework will reach the other end of every interconnector whatever Britain does.

None of which is an argument for leaving the matter to the market. Commercial pressure arrives unevenly and is often reactive to a crisis, rather than pre-empting. It carries no common standard and reaches the best-capitalised operators first – regulation would offer clarity up front. Irrespective, it is almost certain that the operator who establishes today what it can actually detect on its own cables and writes a detection standard into its next cable procurement will meet that duty set out in future legislation at a fraction of the cost of one that begins the week the statute lands.

The practical consequence of waiting is cost, allied with risk of an increasingly geopolitically targeted asset class.

Sabotage dominates the discussion, yet the data suggests it accounts for very little of the damage. The International Cable Protection Committee records roughly 150 to 200 cable faults worldwide each year, of which the large majority come from fishing gear and ships’ anchors; the Government, citing the same source, has put the accidental share as high as 97 per cent.

Nor has any incident yet produced a judicial finding of state sabotage. The Eagle S prosecution was dismissed by the Helsinki District Court in October 2025 for want of jurisdiction, and reopened on appeal in August 2026, without anyone being convicted. Prosecutors alleged negligence rather than intent. In Taiwan, a captain was jailed in June 2025 for damaging a cable to Penghu, the first conviction of its kind. Elsewhere, attribution remains contested.

That ambiguity is an argument for monitoring rather than against it. A capability that detects an anchor dragging towards a cable does not need to know the intent behind it to be worth having, because the first few hours matter either way: an operator who knows which vessel passed, when, and over which segment can shorten its repair, pursue recovery against the vessel’s insurers, and give the authorities something to work with. The Eagle S dragged its anchor for some ninety kilometres across several assets before anyone intervened.

It is also worth being precise about what dark vessels do and do not explain. The Government has noted that many high-profile cable breaks involved vessels with the Automatic Identification System (AIS) switched on. AIS reports a position. It does not report whether an anchor is down, and the submarines that have drawn the Royal Navy’s attention over British cables do not broadcast at all. The useful question for an operator is not which vessels are visible on a screen, but what is happening at the cable itself.

 

What operators can do before the rules arrive

Britain is writing security duties for one family of seabed cables while the other, slower to repair and carrying the output of the offshore wind fleet, is left to its owners’ commercial judgement. The defence establishment already treats the two as one problem and the European Union already regulates them as one. The white paper is the moment to close that difference.

Operators need not wait for it. Four things are worth doing now:

    1. Establish where cables share a corridor with telecommunications assets about to be regulated.
    2. Work out how long a mid-route fault would actually take to repair, who would do the work and what the lost generation would be worth.
    3. Establish what can presently be detected, as distinct from what can be diagnosed once the power has stopped.
    4. Open the conversation early with DESNZ, Ofgem, insurers and the Royal Navy’s maritime domain awareness staff, who are already building commercial monitoring relationships on the telecommunications side.
  1.  

This must all be treated as urgent and pressing. Critical Underwater Infrastructure is only going to become more important to the UK as the demands for cheap, clean energy rise exponentially in the AI revolution and the digital economy – dependent on telecoms cables – dominates the UK’s exports. Our adversaries understand this critical dependency with absolute clarity.